Contact Us

Send Us an Enquiry

CALL US

1300 55 34 73

EMAIL US

Case Studies

Sydney Gateway Airport Precinct

Antec provided shear studs for new road and bridge connections that improve access to Sydney Airport and integrate with WestConnex.

Project name

Sydney Gateway

Client

NSW Government delivery partners

Location

Mascot and Airport surrounds, NSW

Year

2020

Scope of work by Antec

Supply of approximately 110,000 shear studs.

 

Background

Sydney Gateway connects WestConnex to the airport terminals through new bridges and ramps to reduce travel times and heavy-vehicle movements on local roads.

 

Challenge

Bridge programme required reliable high-volume stud supply aligned to deck cycles and traffic staging.

 

Antec’s solution

Studs supplied to specification with batch traceability, sequenced to deck pour operations.

 

Implementation

  • Logistics planned around possession windows
  • QA documentation for each structural element
  • Coordination with steel and concrete teams

 

Benefits and results

  • Supported timely bridge completion and opening stages
  • Reduced risk of rework through consistent product performance

 

Key takeaways

  • Bridge projects depend on precise connector supply and documentation to meet programme dates

 

Why this project matters for Antec

Reinforces Antec’s capability in major transport infrastructure.