Powerhouse Parramatta

Antec supplied high volumes of shear studs to support the structural frame and composite floor systems of Western Sydney’s landmark cultural project.

Project name

Powerhouse Parramatta

Client

Lendlease for NSW Government

Location

Parramatta, NSW

Year

2024

Scope of work by Antec

Supply of approximately 90,000 shear studs.

 

Background

Powerhouse Parramatta is one of Australia’s most significant cultural infrastructure projects, managed by Lendlease. Construction involved major piling, heavy lifting and complex steelwork including the museum’s expressive frame.

 

Challenge

A complex structural programme with heavy cranage and large components required dependable stud supply that matched pour sequences and inspection hold points.

 

Antec’s solution

Composite floor shear connectors supplied in scheduled drops with full material certification and welding guidance.

 

Implementation

  • Delivery windows aligned to crane and pour programming
  • Batch QA and traceability documentation for engineer review
  • On-site liaison to support installation quality

 

Benefits and results

  • Smooth slab cycles and no downtime from connector shortages
  • Clear QA records simplified compliance closeout

 

Key takeaways

  • Early logistics planning with the builder keeps complex cultural builds on schedule

 

Why this project matters for Antec

Shows Antec’s capability on iconic, technically demanding public buildings.