Lidcombe Warehouse

Located in Sydney’s inner-west industrial corridor, the Lidcombe Warehouse project required a dependable supply of structural connectors to support a large-scale steel and concrete composite build. Antec was engaged to provide high-quality shear studs on a tight programme to keep construction moving smoothly.

Scope Of Work

Shear stud supply

Approx 100k Shear Studs

Year

2025

Scope

Supply of approximately 100,000 shear studs for steel-concrete composite floors.

 

Background

The Lidcombe Warehouse project forms part of Sydney’s ongoing industrial infrastructure expansion. As with many modern warehouse designs, a steel frame with composite slabs was used to maximise span efficiency and load capacity. This design required tens of thousands of shear studs to secure the concrete slab to the steel structure.

 

Challenge

Tight deadlines and large quantities demanded a supplier who could maintain consistent quality and reliable logistics within the Sydney metro area. Precision in stud sizing and certification was essential to meet engineering standards and structural performance requirements.

 

Antec’s Solution

Antec supplied 100,000 headed shear connectors manufactured for high-load applications. Products were delivered in scheduled batches aligned to steel erection phases. Each batch was fully traceable and supported by Antec’s technical documentation and welding guidelines.

 

Implementation

  • Phased deliveries coordinated with concrete pour sequencing.
  • On-site liaison to ensure installation accuracy and weld integrity.
  • Continuous supply to avoid downtime during slab construction.

Benefits / Results

  • Seamless supply chain reduced risk of delays to critical path activities.
  • Product consistency ensured uniform composite floor performance.
  • Reduced rework and greater assurance for the structural contractor.

Key Takeaways

  • Reliable supply of shear studs is a cornerstone of efficient composite construction.
  • Close coordination between supplier and contractor improves site efficiency.
  • Antec’s local logistics and technical support enable timely project delivery.

Why this project matters for Antec

The Lidcombe Warehouse project illustrates Antec’s flexibility and commitment to serving mid-sized industrial developments with the same level of professional support and quality as major infrastructure projects.